Klimatorium, Lemvig Havn

Client: Lemvig Vand & Spildevand.
Main contractor: Kaj Bech A/S
Problem: The building is located close to the water’s edge and is only partially protected from high tide by a concrete wall. There are two openings, respectively 7m and 23m, requiring protection during high tide situations.
Solution: the mobile flood and storm surge protection system with stop logs is been installed upon warning of high tide in the two openings in the concrete wall. U-profiles are embedded in concrete walls and anchor plates for movable posts in the ground.
Type and dimensions: WINTEC/Eko-System, Stoplogs type 100/200
Protection: Height 1.4m