Flood door at Metro Station Kgs. Nytorv, Copenhagen

Metroselskabet, Metro Station Kgs. Nytorv, Transfer tunnel

Client: Metroselskabet
Main contractor: NCC A/S
Problem: Storm surge protection of transfer tunnel.  In the event of water entering the metro station, flooding must be prevented in both metro stations.
Solution: Design, manufacture and installation of Flood Doors that automatically close when water enters the metro during storm surges, thereby separating the two stations.
Type and dimensions: Flood doors 2 x 4300×2850
Protection: for 5m column of water